33 kV MVAC export cable system connecting the 49.5 MW Kentish Flats Extension array to landfall at Hampton Pier and onward to the existing onshore route to Red House Farm substation.
Bohlen & Doyen carried out subsea cable installation works for Vattenfall on the Kentish Flats Extension, including the export cable connection. Using its cable-laying vessel BoDo Installer, the company loaded the array and export cables in Nordenham, Germany, transported them to the Kentish Flats Extension site in the Thames Estuary and laid them offshore. BoDo Installer also undertook the export cable installation at the foreshore landfall near Hampton Pier, coordinating with beach-based civil works and a Vattenfall project team onshore.