During the 2015 construction of the Kentish Flats Extension, two 33 kV export cables for the extension were installed alongside the existing Kentish Flats export circuits, running offshore from the turbine array to landfall near Hampton Pier, Herne Bay, and then along the established onshore route to the Red House Farm substation; the 18 km export system and associated 12 km of inter-array cabling were buried using water jetting to a depth of approximately 0.5–2 m below the seabed.