PFISTERER was contracted by Siemens Energy to supply turnkey cable systems for the DolWin4 offshore grid connection. PFISTERER was responsible for implementing the entire 66 kV AC cable infrastructure on the DolWin4 offshore converter platform between the gas-insulated switchgear (GIS), transformer and the submarine cable connection, including planning and engineering services, installation, and project management.