Neutral
Informational - no clear directional impact
Low Impact
Minor progress or informational
In September 2024, C-Power commissioned a Multi-Beam Survey covering both infield and export cables at the Thornton Bank wind farm to assess the post-reburial condition and burial status of Export Cables A and B, with the results documented in a dedicated IMDC burial assessment report.