Phase 1 pilot units on gravity foundations.
Phases 2 and 3 units on jacket foundations (30 + 18 = 48).
1 Cost inflated in local currency then converted to euros (where applicable).
In September 2024, C-Power commissioned a Multi-Beam Survey covering both infield and export cables at the Thornton Bank wind farm to assess the post-reburial condition and burial status of Export Cables A and B, with the results documented in a dedicated IMDC burial assessment report.