egeplast supplied its Power Protect PE protective pipe system for the BorWin5 onshore route between Hilgenriedersiel and the Garrel/Ost converter station. The protective pipe system was used by De Romein GmbH during civil engineering and cable installation works on the onshore cable corridor, including sections installed using closed construction methods (HDD).