Bockstigen — export cable to Gotland-Valar: 1 × 10 kV MVAC · 4 km; the electrical sea cable was laid with help of the ferry and anchored to the seabed, then connected to the turbines and to the land grid.
Vindkompaniet carried out installation of the electrical sea cable (and an accompanying glass-fibre communication cable) for the Bockstigen offshore wind farm grid connection to Gotland-Valar. The installation was performed using Vindkompaniet’s own small ferry (with supporting barge and tug), with the cable laid and then anchored to the seabed before being connected to the turbines and the onshore grid connection point.