SMIT provided full project management and marine transport and installation support for the Belwind offshore high-voltage transformer substation (offshore substation). SMIT designed the seafastenings, managed the transport of the prefabricated 1,175-tonne substation on a flat-top barge from Hoboken to the offshore site off Zeebrugge, and supported the offshore installation lift using the sheerlegs Taklift 4, with tugs and support vessels assisting positioning during the lift. The work was performed on behalf of client Fabricom.