Tele-Fonika Kable (TFKable) was contracted by Equinor and Polenergia to design, produce and deliver onshore high-voltage export cables for the Bałtyk 2 and Bałtyk 3 offshore wind farms. The scope includes approximately 85 km of 220 kV HV export land cables connecting the offshore substation landfall to the onshore substations at Pęplin, and approximately 38 km of 400 kV extra-high-voltage underground land cables connecting the Pęplin onshore substations to PSE's Słupsk Wierzbięcino substation (the grid connection point). The cables are manufactured at Tele-Fonika Kable's Bydgoszcz plant in Poland, with deliveries scheduled from January 2025 to November 2026. The contract includes cable accessories and installation support.