Supplier for Bałtyk 2 Export
Tele-Fonika Kable was selected by Equinor and the Polenergia Group to produce power cables for the approximately 14 km onshore connection corridor linking the coast to the onshore substations for the Bałtyk 2 export (grid connection) infrastructure.