Polimex Mostostal, as consortium partner to GE Vernova for the Baltica 2 onshore grid connection, was responsible for civil works and equipment installation for the 275/400 kV onshore high-voltage substation and for laying the associated onshore export lines to transfer power into the Polish Power System.