Installation of the Anholt Export Cable; Energinet.dk contracted NKT-Cables to supply and install export cable; NKT-Cables subcontracted JD-Contractor for submarine cable installation/embedding/post-burial; delivered length 24.5 km; voltage 245 kV; vessels used incl. C/S Cable One
JD-Contractor A/S was subcontracted by NKT-Cables to carry out marine works for the Anholt Export Cable, including installation of the submarine export cable, pre-trenching, seabed embedding, and post-burial activities. The scope included loading the cable in Kalundborg in two sections, transporting the sections to site, laying the cable between Djursland and the wind farm, and jointing the two sections; a delayed pull-in at the transformer station was reported for May 2012. The marine spread listed for the work included C/B Henry P. Lading, C/S Cable One, T/B Naja, T/B Thor, T/B Odin, and S/B Victor.