Neutral
Informational - no clear directional impact
Low Impact
Minor progress or informational
In 2015, the Portuguese government allocated responsibility for the design and commissioning of the WindFloat Atlantic export cable to the transmission system operator Redes Energéticas Nacionais (REN), formally assigning REN the role of developing and delivering the offshore grid connection for the 25 MW floating wind farm off Viana do Castelo.