66 kV inter-array aluminum core cables and accessories, totalling 130 km; scope includes engineering, manufacturing, testing, and delivery
Twentsche Kabelfabriek BV (TKF), part of TKH Group N.V., was awarded an inter-array cable supply contract by Luxcara for the Waterkant offshore wind farm (BSH site N-6.7) in the German North Sea. TKF’s scope covered engineering, manufacturing, testing and delivery of approximately 130 km of 66 kV aluminium-core inter-array subsea cables and associated accessories, intended to provide the electrical connections between the project’s offshore installations and Amprion’s converter platform. The cables were to be produced at TKF’s carbon-neutral facility in Eemshaven, the Netherlands.