Siemens Gamesa entered a capacity-reservation agreement with Luxcara on 25 August 2025 covering 19 SG 14-236 turbines uprated to 15.5 MW (including power boost) for the Waterkant offshore wind farm. The Waterkant reservation is an option held in parallel to Luxcara's larger 97-turbine reservation for the neighbouring Waterekke project (Luxcara stated the Waterkant SGRE reservation is contingent on examining the synergies of standardising on the same turbine platform across both German Luxcara North Sea sites). The arrangement supersedes Luxcara's prior preferred-supplier reservation with Ming Yang Smart Energy (July 2024, 16 × up-to-18.5 MW), which was mutually terminated on 25-26 August 2025. Luxcara stated the turbine change had been raised with the relevant approval authorities and the Federal Ministry for Economic Affairs and Energy. Firm turbine-supply contract not yet announced.