Neutral
Informational - no clear directional impact
Low Impact
Minor progress or informational
As of a March 2025 METCentre presentation, the existing 22 kV export cable system (15 MW) at Karmøy, which uses the Unitech Zefyros (Hywind Demo) turbine as a floating hub, is reported to be in stable and reliable operation with a stated 25‑year lifetime, though its daisy‑chain configuration imposes limited capacity and flexibility for connecting multiple test units.