Areva was contracted by Trianel to supply 40 MultiBrid M5000 (Areva M5000-116) offshore wind turbines for Trianel Windpark Borkum (Phase 1). The contract scope also covered commissioning, testing, and maintenance of the turbines (with an option for additional turbines mentioned in the source).