Phase 1 (TWB I) deployed 40 × Adwen/Areva 5 MW turbines on tripod foundations.
Three-legged tripod steel substructure. Tripods reported as ~45 m high and were anchored with three driven steel piles ('steel nails') per tripod. Pile diameter reported as around 3 m; pile length reported in sources as approximately 35–45 m.
No lifecycle events recorded yet.