JBO carried out basic and detailed engineering for the monopile substructure at Trianel Windpark Borkum II, covering both the monopile and transition piece. The scope included permitting design, connection design, and secondary steel design (e.g., boat landings, platforms and J-tubes), along with specifications, material selection, weight control and fatigue analyses, for Seaway Heavy Lifting as client.