Export cable connecting DolWin Alpha converter station with the wind farm’s internal substation platform; 7.3 km length mentioned.
Jan De Nul Group installed the export cables connecting Trianel Windpark Borkum II to TenneT’s offshore grid infrastructure in the German North Sea. Jan De Nul also carried out the electrical and mechanical delivery and installation of the project’s wind turbines, with turbine installation reported as having started in spring 2019.