Positive
Project advancing - milestone achieved
Medium Impact
Significant progress or notable issue
Over the 2017–2018 planning period, JBO performed FEED, basic and detailed engineering for the monopile and transition piece substructures at Trianel Windpark Borkum II, including permitting and connection design, secondary steel detailing, material selection, weight control and fatigue analyses for the foundations.