Positive
Project advancing - milestone achieved
Medium Impact
Significant progress or notable issue
By 2000, installation of the SwePol Link cable system between Sweden and Poland was completed, as evidenced by environmental studies conducted on the effects of the operating cable after system installation in 2000, following pre‑installation baseline studies in 1999 and a cable implementation period spanning 1999–2000.