Positive
Project advancing - milestone achieved
Medium Impact
Significant progress or notable issue
By 9 November 2023, the route alignment for a new high‑voltage cable system between station Spanager and Orehoved, including the Storstrømmen crossing, had been defined. The design specifies double cable circuits from Spanager to Haslev Øst (~18 km) and from Vordingborg Nord to Orehoved (~14 km, with 7 km under Storstrømmen), and a single circuit between Haslev Øst and Vordingborg Nord (~32 km). The routing was fixed to connect the substations via the shortest practical path while minimising land-use conflicts and interactions with existing residences and environmental interests, and includes use of underground boring to reduce surface disturbance.