Hellenic Cables, as part of a consortium with DEME, signed an EPCI contract with Elia Asset NV/SA for the Princess Elisabeth Island (MOG II) initiative to engineer, design, manufacture and supply three 220 kV HVAC submarine offshore export cable systems totaling 165 km. The scope includes supplying accessories, on-site jointing, termination and testing, commissioning, and maintenance of the export cable system connecting the beach transition jointing pit to the transition jointing area on the artificial energy island within the Princess Elisabeth Zone wind farm area.