Completion of the first submarine cable links Kos-Kalymnos (25,4 Km) and Paros-Naxos (15 Km) by FULGOR on behalf of DEI (Public Power Co)
In 1973 FULGOR completed the original submarine power cable interconnection between the Greek Cycladic islands of Paros and Naxos on behalf of DEI (Public Power Co). The project involved turnkey delivery of an HVAC submarine cable system operating at around 15 kV to reinforce the local grid and improve security of electricity supply on the islands. FULGOR, a Greek cable manufacturer and installer, supplied and installed approximately 30 km of subsea cable corresponding to two parallel 15 km cable circuits along the Paros–Naxos route, including all works required to complete the inter-island link for DEI.