Vattenfall contracted Pfisterer to supply electrical connection technology for the Nordlicht 1 and 2 offshore wind farms. Pfisterer’s scope was to enable secure electrical connections between wind turbines and the subsea cable network by delivering pre-assembled solutions designed for direct offshore installation (installation planned to start in early 2027).