Positive
Project advancing - milestone achieved
High Impact
Major milestone or critical setback
The DEDDIE network development plan lists a medium-voltage (20 kV) submarine interconnection between Nisyros and Tilos, consisting of two 3x35 mm² copper cables with a total length of 32 km, with the year recorded as 1989, indicating that this link has been in operational service since that time as part of the Rhodes distribution area network.