Gallagher Group, a Kent-based contractor, has been engaged by main EPC contractor Siemens Energy to support construction of NeuConnect’s UK converter station on the Isle of Grain. The company is responsible for pre-cast concrete works and associated activities on site, contributing to the formation of the converter halls and control building structures. Its work includes installing pre-cast concrete elements that form part of the superstructure for the 24-metre-high converter hall and related buildings, as part of the wider civil and structural programme for the NeuConnect HVDC converter station.