Positive
Project advancing - milestone achieved
Low Impact
Minor progress or informational
On 1 May 2019, GEOxyz mobilised the survey vessel Geo Ocean III to begin offshore geophysical surveys for the N05-A development, covering the future N05-A platform location, the planned gas pipeline route to the NGT system, and the subsea power cable route to the Riffgat transformer station, as specified in ONE-Dyas’ pipeline and power cable route survey scope.