Siemens Wind Power supplied 27 × Siemens SWT-3.6-107 turbines (97.2 MW total) for the Lynn Offshore Wind Farm, with subsequent operations and maintenance scope. Twin-site delivery alongside Inner Dowsing (54 turbines combined across both farms). Turbines installed by MPI Offshore (vessel MV Resolution) by mid-2008; full operations from March 2009.