MT Højgaard A/S installed all 27 monopile foundations and transition pieces at Lynn, using the MPI Resolution heavy-lift jack-up vessel as part of the twin-site campaign with Inner Dowsing (54 monopiles total). Foundations installed by end of 2007; cable and turbine works followed through 2008.