Energy Solutions B.V. supported Eneco Wind (Clucius C.V.) on the Luchterduinen offshore wind farm electrical infrastructure, including contributing during the design phase to securing the 150 kV grid connection and the design of the electrical infrastructure. Energy Solutions also provided technical support during tendering and supported interfaces with the 150 kV grid connection (TenneT) and the wind turbine supplier, and performed quality checks and factory acceptance testing activities related to the export and land cable packages and associated control room.