Energy Solutions B.V. supported Eneco Wind (Clucius C.V.) on the Luchterduinen electrical infrastructure and 150 kV grid connection. During development and tendering, it provided technical support for securing the 150 kV grid connection, managing interfaces with TenneT TSO and the wind turbine supplier, and supporting the Package Manager for Electrical Infrastructure. During construction, it supervised installation of the electrical infrastructure and carried out quality checks, site inspections and factory acceptance testing (FAT), including FAT/quality checks for the 25 km 150 kV submarine export cable and the 150 kV land cable section to the Sassenheim substation, as well as commissioning support.