Energy Solutions B.V. supported Eneco Wind (Clucius C.V.) on the Luchterduinen offshore wind farm electrical infrastructure, including the 150 kV grid connection and associated export system. During the design and tender phases, Energy Solutions provided technical support for the electrical infrastructure and supported interfaces with the wind turbine supplier and TenneT’s 150 kV grid connection. During construction, it supervised installation of the electrical infrastructure and performed quality checks, site inspections and factory acceptance tests (FAT), including for the 33/150 kV Offshore High Voltage Station (OHVS) and the export cable system, and supported commissioning activities.