130 kV export connection / 145 kV HVAC; approx. 7 km offshore (subsea) export cable plus approx. 2 km onshore 130 kV cable; cable laid from ABB factory loading in Karlskrona.
ABB manufactured and supplied the 130–145 kV export cable system for the Lillgrund grid connection, with production/loading from ABB’s Karlskrona facility. The scope included the submarine export cable section laid between the offshore substation and the Swedish coast (about 7 km) and the onshore cable section linking the coastline to E.ON’s Bunkeflo substation near Malmö (about 1.7–2 km).