The provided sources do not mention a project called “L'Emporda Export” explicitly; they describe the export system for the “Tramuntana Floating Offshore Wind Farm Project” off the Empordà (Girona). For that described scheme, export cables (stated as buried) run about 24 km offshore to a landfall in the municipality of Sant Pere Pescador, using HDD for the sea–land transition. Onshore, a substation located about 1 km from the coast steps the export circuit up to 400 kV, with a 400 kV underground transmission link connecting into the Spanish grid via the Santa Llogaia substation (near Figueres).
Landfall options
Landfall/transition in the municipality of Sant Pere Pescador; HDD technique mentioned for the maritime–terrestrial transition.
Grid connection options
Connection to the Spanish grid is described via an underground 400 kV onshore transmission link to the Santa Llogaia substation (near Figueres).
Cable protection
| Spain | Girona (Catalonia) | |
|---|---|---|
| Landfall | N/A | — |
| Grid Connection | — | Santa Llogaia substation (near Figueres) |
Spain
Girona (Catalonia)