Denys responsible for civil and cable pulling scope related to the onshore cable routes (BalWin4 and LanWin1 525 kV HVDC cable systems).
Denys, as consortium partner alongside Jan De Nul Group and LS Cable & System, signed a contract with TenneT for the 525 kV HVDC cable system package covering the BalWin4 and LanWin1 grid connections. Denys’ scope was the civil works and cable-pulling activities associated with the onshore cable routes for the LanWin1 connection to the Unterweser grid connection point.