Neutral
Informational - no clear directional impact
Low Impact
Minor progress or informational
As part of wider environmental and infrastructure mitigation measures for the Porto Marghera–Fusina area, authorities planned the undergrounding of the existing high‑voltage overhead power line along the lagoon stretch between Fusina and Sacca Fisola and the creation of a new underground line between Sacca Serenella and Cavallino. This planning measure effectively defined the future Laguna Veneta: Fusina 2 – Sacca Fisola 132 kV cable link as a replacement for the visually intrusive overhead alignment in the Venetian Lagoon.