Trelleborg (with First Subsea) supplied dynamic bend stiffener connector systems (eleven units) for Kincardine floating wind farm cables.
Trelleborg, working with First Subsea, supplied dynamic bend stiffener connector systems for the Kincardine floating offshore wind farm under a Cobra Group contract. The scope described included eleven connectors incorporating Trelleborg’s Njord dynamic bend stiffener technology to provide continuous over-bending and fatigue protection at the critical cable entry point on floating turbine platforms.