First export cable installation completed by CMOS Installer. Three 28-kilometre sections are installed with the cable pulled in at both the offshore substation platform and the Cockenzie substation site.
CMOS Installer carried out the first export cable installation for the Inch Cape offshore transmission system. The project website stated that three 28-kilometre cable sections were installed and the cable was pulled in at both the offshore substation platform and the Cockenzie substation site, indicating marine installation vessel activity for the export cable connection between the offshore substation and landfall/substation interface.