ABL was awarded a contract by TenneT to provide marine warranty survey services for the installation of three 2 GW export cable systems in the Netherlands, including the IJmuiden Ver Gamma offshore grid connection (as well as IJmuiden Ver Beta and Nederwiek 2). ABL’s scope included technical review and approval of documentation, procedures and drawings for warranted activities, suitability surveys, and on-site attendance at fabrication, loadout and offshore locations to review and approve warranted transportation and installation operations through to 2029.