ABL was awarded a contract by TenneT to provide marine warranty survey (MWS) services for the installation of the IJmuiden Ver Beta 2 GW export cable system (as part of a three-project scope also covering IJmuiden Ver Gamma and Nederwiek 2). ABL’s scope included technical review and approval of documentation, procedures and drawings for warranted activities, suitability surveys, and on-site attendances at fabrication and loadout sites and offshore to review and approve warranted transportation and installation operations. The services were expected to run until 2029.