DEME carried out inshore lay-and-bury works for the IJmuiden Ver Alpha export cable programme in the Veerse Meer (Zeeland, the Netherlands), installing power and fibre-optic cables using barges and cable-handling equipment, with 24/7 operations referenced in the project description.