TechnipFMC installed the seabed anchoring system for Hywind Scotland using the vessel Deep Explorer. The work included installation of 15 suction anchors (three per floating unit) between April and June 2017 to enable connection of the catenary mooring lines for the five spar-buoy floating wind turbines offshore Peterhead.