Eitech supplied a 40 kVA diesel generator and associated control system for the new 12 kV secondary substation installed on Stora Fjäderägg within Umeå Energi’s Holmön island cable network. The generator forms part of the backup power solution integrated into the Holtab-designed substation, providing automatic start and load-taking capability during grid outages to ensure continued electricity supply to the island’s facilities.