Heerema Marine Contractors’ heavy lift vessel Sleipnir installed the jacket for the Hollandse Kust (west Beta) offshore transformer platform (offshore substation) approximately 53 km off the coast of Egmond aan Zee. The jacket was lifted from a floating pontoon and placed on the seabed during the offshore installation campaign.