A consortium of CG Power and Industrial Solutions, ENGIE Fabricom and Iemants was awarded a EUR 150 million subcontract by Van Oord in June 2014 for the design and installation of two offshore substations (Buitengaats and ZeeEnergie) for the 600 MW Gemini wind farm. Van Oord held the main EPC contract (EUR 1.3 billion) covering foundations, electrical infrastructure and wind turbines.