engineering, supply and installation of the inner-array cables
Seaway 7 was responsible for transport and installation of 95 monopile foundations at the East Anglia THREE offshore wind farm, including associated seabed preparation and scour protection, and for the engineering and installation of the project’s inner-array (inter-turbine) cables.