VBMS won a contract of around EUR 100 million for the supply, installation and burial, as well as termination and testing of 102 66kV inter-array cables.
VBMS won a contract for the East Anglia ONE offshore wind farm to supply, install and bury the 66 kV inter-array cable system, including termination and testing for 102 inter-array cable connections. The contract scope covered installation and burial of the array cables connecting the wind turbines within the 714 MW project offshore Suffolk.