Vysiion supported the Dudgeon project’s communications and security infrastructure via Siemens Transmission & Distribution. Its scope included design and project management plus supply, installation, configuration, testing and on-site commissioning of communications systems at the Onshore 132 kV substation at Necton, the Offshore Substation Platform, and the remote Marine Operations Centre at Great Yarmouth. Systems referenced included the transmission backbone between Necton and the offshore platform, SCADA LAN communications subsystems, passive fibre/structured cabling, interfaces for monitoring/protection and other third-party systems, Wi‑Fi, and perimeter security/CCTV-related communications infrastructure.